EPC delivery, PV + BESS

250 kW PV + 250 kWh BESS at a commercial site in Northeastern Bulgaria

A 250 kW photovoltaic installation combined with a 250 kWh battery energy storage system at a commercial site in Northeastern Bulgaria, delivered by Elevat Solar OOD as EPC contractor. Commissioning period: 2023-2024.

Project snapshot

Asset typeCommercial and industrial PV with integrated battery storage
PV capacity250 kW
BESS capacity250 kWh
RegionNortheastern Bulgaria (location withheld)
Delivery roleEPC contractor under Elevat Solar OOD
Commissioning2023-2024
SignatoryVenelin Dimitrov, Managing Director

Scope delivered

Elevat Solar OOD acted as EPC contractor across the full engineering, procurement and construction scope for both the PV and the BESS parts:

About this case study. Facts stated here come from Elevat Solar's own project records. The owner's name, the exact location, commercial terms and equipment brands are withheld. Published for the purpose of demonstrating our EPC capability on C&I-scale PV combined with battery storage in Bulgaria.