EPC delivery, PV + BESS
250 kW PV + 250 kWh BESS at a commercial site in Northeastern Bulgaria
A 250 kW photovoltaic installation combined with a 250 kWh battery energy storage system at a commercial site in Northeastern Bulgaria, delivered by Elevat Solar OOD as EPC contractor. Commissioning period: 2023-2024.
Project snapshot
| Asset type | Commercial and industrial PV with integrated battery storage |
| PV capacity | 250 kW |
| BESS capacity | 250 kWh |
| Region | Northeastern Bulgaria (location withheld) |
| Delivery role | EPC contractor under Elevat Solar OOD |
| Commissioning | 2023-2024 |
| Signatory | Venelin Dimitrov, Managing Director |
Scope delivered
Elevat Solar OOD acted as EPC contractor across the full engineering, procurement and construction scope for both the PV and the BESS parts:
- Detailed electrical design for PV and BESS integration at a shared point of connection
- Equipment procurement for modules, inverters, mounting, battery system and controls
- Installation on site
- DC and AC cabling, protection and metering
- EMS configuration for coordinated PV and BESS operation
- Grid connection coordination with the DSO
- Commissioning and acceptance testing
- Handover with as-built documentation and O&M manual
About this case study. Facts stated here come from Elevat Solar's own project records. The owner's name, the exact location, commercial terms and equipment brands are withheld. Published for the purpose of demonstrating our EPC capability on C&I-scale PV combined with battery storage in Bulgaria.