A 700 kW photovoltaic installation combined with a 700 kWh battery energy storage system at an industrial production site in Western Bulgaria. The BESS is configured for the owner's self-consumption during peak-price hours. Delivered by Elevat Solar OOD as EPC contractor. Commissioning period: 2023-2024.
| Asset type | Industrial PV with integrated battery storage for self-consumption |
|---|---|
| PV capacity | 700 kW |
| BESS capacity | 700 kWh |
| Region | Western Bulgaria (location withheld) |
| Host facility | Industrial production site with continuous process load |
| Delivery role | EPC contractor under Elevat Solar OOD |
| Commissioning | 2023-2024 |
| Signatory | Venelin Dimitrov, Managing Director |
Elevat Solar OOD acted as EPC contractor across the full engineering, procurement and construction scope for both the PV and the BESS parts, integrated with the owner's existing on-site electrical infrastructure:
The host facility runs a continuous production process with substantial baseload electricity demand. The 700 kW PV covers a share of the daytime load; the 700 kWh BESS captures surplus daytime generation and discharges during the morning and evening high-price hours, reducing the owner's exposure to peak tariffs.