EPC delivery, PV + BESS, industrial

700 kW PV + 700 kWh BESS at an industrial site in Western Bulgaria

A 700 kW photovoltaic installation combined with a 700 kWh battery energy storage system at an industrial production site in Western Bulgaria. The BESS is configured for the owner's self-consumption during peak-price hours. Delivered by Elevat Solar OOD as EPC contractor. Commissioning period: 2023-2024.

Project snapshot

Asset typeIndustrial PV with integrated battery storage for self-consumption
PV capacity700 kW
BESS capacity700 kWh
RegionWestern Bulgaria (location withheld)
Host facilityIndustrial production site with continuous process load
Delivery roleEPC contractor under Elevat Solar OOD
Commissioning2023-2024
SignatoryVenelin Dimitrov, Managing Director

Scope delivered

Elevat Solar OOD acted as EPC contractor across the full engineering, procurement and construction scope for both the PV and the BESS parts, integrated with the owner's existing on-site electrical infrastructure:

Why this configuration

The host facility runs a continuous production process with substantial baseload electricity demand. The 700 kW PV covers a share of the daytime load; the 700 kWh BESS captures surplus daytime generation and discharges during the morning and evening high-price hours, reducing the owner's exposure to peak tariffs.

About this case study. Facts stated here come from Elevat Solar's own project records. The owner's name, the exact location, commercial terms and equipment brands are withheld. Published for the purpose of demonstrating our EPC capability on industrial-scale PV combined with battery storage for self-consumption in Bulgaria.